COMMERICIAL BASEMENT SHOWER BLOCK INSTALLATION
Oliver's Services • July 22, 2025

SHARE PROJECT

PROJECT TYPE

Commercial Basement Shower Block Installation

LOCATION

10 Templeback, Bristol

CLIENT

PROCOOL & Morgan Lovell

JOB DESCRIPTION

Oliver’s Services recently completed the mechanical installation of a bespoke basement-level shower block at 10 Templeback, working in collaboration with PROCOOL and office fit-out specialists Morgan Lovell.


The installation includes six high-specification shower enclosures, each fitted with concealed shower valves for a clean and contemporary finish. To ensure reliable drainage in a below-ground setting, three commercial waste pumps were installed.


A new water system was designed and implemented, centred around a Dutypoint cold water booster set and a 300L unvented hot water cylinder, both fed by a Daikin air source heat pump (ASHP). The system provides efficient hot water delivery and pressure stability for multiple users, meeting the demands of modern commercial use.


This project reflects our expertise in energy-efficient commercial plumbing and complex plantroom installations in challenging environments.

COMMERICIAL BASEMENT SHOWER BLOCK INSTALLATION

SHARE PROJECT

By Oliver's Services August 4, 2025
PROJECT TYPE
By Oliver's Services July 22, 2025
PROJECT TYPE
By Oliver's Services July 22, 2025
PROJECT TYPE
By Oliver's Services April 7, 2025
PROJECT TYPE
By Olivers Services April 7, 2025
PROJECT TYPE
A long hallway filled with lockers and a sink.
By Oliver's Services November 7, 2024
PROJECT TYPE